A breath of fresh air for new London headquarters

Bloomberg’s inspiring new office buildings fly the flag for sustainability and innovation.

Financial and media giant Bloomberg wanted a European headquarters that would bring its 4,000 London employees under one roof.

But they didn’t just want an ordinary office building. They wanted a model of innovation and sustainability. A building that inspired. A place their staff would be excited to work in.

So they commissioned Foster + Partners, bringing us in as construction project manager. Having worked with the architect before, we had experience of making their visions a reality.

Working in the heart of the historic City of London, the challenges were immense. From the scale of the foundations, to the complex engineering needed to create the vast column-free workspaces. And in the meantime, synchronising the thousands of people working on the project.

We choreographed the whole operation, using high quality materials, precision engineering and specialist workmanship.

Bloomberg liked the results so much; they asked us to move them in.

Project summary

    • Client: Bloomberg LP
    • Sector: Commercial
    • Size: 66,354
    • Region: London
    • Service: Construction
    • Completion Date: 2017
Interior view of the six-story high, bronze-clad spiral ramp at Bloomberg HQ

Laser efficiency

Applying the bronze cladding to the building’s spiral ramp was a significant engineering challenge. Six floors high, with almost no design tolerance on its steel core, we needed to calculate its as-built geometry before installing the cladding.

We achieved this with pinpoint accuracy using sophisticated 3D laser scanners. So any changes to cladding could be made at the factory, leading to faster, more efficient installation.

Continuous improvement

The project was so complex; we arranged weekly sessions where specialists presented how they were tackling one design element. Providing a forum where the whole management team could discuss ideas for improving design, fabrication and installation. The resulting improvements led to exemplary standards for the new building.

Exterior walkways between the buildings at Bloomberg HQ
Exterior view of Bloomberg HQ showing the building’s distinctive architecture with bronze fins

Flexible expertise

To save on demolition, the new basement would sit within the existing one. But finding unexpected problems with the original basement, we had to demolish more.

So as we continued to learn about the ground conditions, we adapted the piling sequence. This flexibility meant the programme stayed on track and expensive piling equipment had minimal downtime.

Safety measures

Site safety was maximised thanks to free health and safety training for everyone on site. Tailored specifically to the construction programme, training was funded thanks to a rebate from an on-site HSS hire shop.

Spacious main lobby of Bloomberg's European HQ, featuring modern design elements and high-end finishes and spiral ramp

Sustainability

Innovative petal-shaped ceiling panels at Bloomberg HQ that integrate heating, cooling and lighting

Bloomberg asked for a model of sustainability. And they got one.

  • The building got a BREEAM score of 98.5% - the highest design-stage score for a major development.
  • Ingenious bronze fins on the building’s façade provide ventilation and shade. Along with smart sensors adjusting airflow, they’re expected to reduce CO2 by up to 300-tonnes a year.
  • Elegant petal-shaped ceiling panels incorporate heating, cooling, lighting and acoustics, using 40% less energy than traditional lighting.
  • An energy-efficient onsite heat and power generation centre recycles surplus heat for cooling and heating.
  • Using 73% less water than a typical office building, water is taken from the roof, cooling tower, sinks and showers. Then it’s treated and recycled for use in the vacuum flush toilets.

Awards

  1. DECORATIVE

    RIBA London Award (2018)

  2. DECORATIVE

    RIBA National Award (2018)

  3. DECORATIVE

    BREEAM Regional Project for Western Europe

  4. DECORATIVE

    BREEAM Commercial Projects - Design winner

  5. DECORATIVE

    Shortlisted for the Stirling Prize

  6. DECORATIVE

    Structural Steel Design Award 2018

Commercial projects

  1. Haymarket, Edinburgh

    Edinburgh’s iconic Haymarket site in the heart of the city centre is set to become the highest profile mixed-use development in Scotland.

    Sectors: Commercial, Retail
    Region: Scotland
    Read more about
  2. The exterior of Ilona Rose House in London’s Soho district

    The construction of Ilona Rose House, London

    Digital construction, complex temporary works and sustainable cladding solutions were key in delivering the striking new Ilona Rose House development in London’s Soho district.

    Sectors: Commercial, Leisure
    Region: London
    Read more about
  3. Luxury retail space within Quadrant 3 feature high ceiling and sophisticated Art Deco-inspired interior

    A celebration of quality in London's West End

    Completed four months early and under budget, Quadrant 3 was hailed as “outstanding” by client The Crown Estate.

    Sectors: Commercial
    Region: London