18th Apr 2024

Sir Robert McAlpine appointed to deliver 2 Finsbury Avenue

We are thrilled to announce we have been appointed by the Broadgate joint venture, between British Land and GIC, to deliver 2 Finsbury Avenue (2FA), a dual high-rise, mixed-use building located in the heart of Broadgate.

Due to be completed in 2027, the 750,000 sq. ft. project is the largest yet to be undertaken at the Broadgate campus.

Sitting at a height of 170 metres and due to be completed in 2027, 2FA will be an instantly iconic addition to Broadgate and to London’s skyline. The appointment follows work undertaken by Sir Robert McAlpine in delivering 100 Liverpool Street and 1 Broadgate, extending the longstanding partnership with British Land.

The building will boast a 21-storey West office tower and 36-story East office tower, characterised by triangular patterns combining a solid and glazed sawtooth-shaped façade that supports double height spaces. The towers will be linked by a 12-storey podium, incorporating green, leisure and a range of publicly accessible spaces, with a single-story Winter Garden at level 13 connecting the two towers.

2FA will raise the bar in its sustainability strategy. It will be all-electric, and a smart-enabled development ensuring leading carbon and energy efficiency in operation, as well as BREEAM Outstanding, WELL Platinum, WIRED Platinum, Nabers 5-star and EPC ‘A’ accreditations. The office design, designed by architects 3XN and sustainability consultants GXN, includes green spaces and terraces that are designed to foster creative collaboration and social interaction.

Community engagement with the scheme took place amid COVID restrictions, seeing a successful online exhibition facilitated through a dedicated public website, replacing the traditional public consultation. Invitations reached 800 local properties and Broadgate tenants, with local City members and residents expressing excitement to the scheme.

Grant Findlay, Executive Managing Director of Buildings at Sir Robert McAlpine said: "We are thrilled to be delivering another world class building for British Land and GIC. 2 Finsbury Avenue is the sixth scheme in the Broadgate framework, following the multi-award-winning 100 Liverpool St and 1 Broadgate projects. This is testament to exemplary industry collaboration and our commitment to nurturing close relationships with our clients to better realise their aspirations and deliver technical excellence."

Latest news from Broadgate

  1. 2 Finsbury Avenue celebrates bottoming out ceremony

    10 Dec 2024

    Guests gathered at the lowest point of the structure’s foundations, just over 50m below ground.

    Read more about
  2. Façade installation completes at 1 Broadgate

    19 Sept 2024

    2,432 recycled aluminium panels in 19 colours now adorn this 14-storey sustainable landmark, delivering 500,000 sq ft of office and 46,000 sq ft of retail space.

    Read more about
  3. Engineering ingenuity: Floating tower crane at 2 Finsbury Avenue

    22 Aug 2024

    At 2 Finsbury Avenue on the Broadgate Campus, an innovative tower crane solution was engineered to meet the construction needs of the site.

    Read more about

Latest news

  1. 2 Finsbury Avenue celebrates bottoming out ceremony

    10 Dec 2024

    Guests gathered at the lowest point of the structure’s foundations, just over 50m below ground.

    Read more about
  2. ONE Station Hill reaches practical completion

    06 Dec 2024

    Congratulations to all those who have worked on ONE Station Hill in Reading as the project completes.

    Read more about
  3. Green Apple award for project with sustainability at its core

    27 Nov 2024

    The sustainable approach to delivery taken by our AmeySRM JV team on the A533 Expressway Replacement Bridge Scheme has seen the project honoured with an international Green Apple Environment Award.

    Read more about
View all news